Resilient Broward — measured performance
Funded structures, what each was modeled to deliver, what field measurements show, and how groundwater and tides compare with the County's adopted standards.
Program figures are sourced and labeled live. Structure, groundwater, and tidal performance uses illustrative demo data until live stations are connected to IoT-LogIQ.
Answers come only from this module's connected data. Figures marked illustrative are demo data.
A measured-performance view of Broward County's Resilience Plan: funded structures, what each was modeled to deliver, what the field measurements show, and how groundwater and tides compare with the County's adopted standards.
| Project type | Projects | Est. construction ($M) |
|---|---|---|
| Control structures | 159 | 388 |
| Culvert crossings | 41 | 19 |
| Pump stations | 33 | 575 |
| Drainage behind seawalls | 30 | 518 |
Source: Resilient Broward Grant Program stakeholder webinar, August 19, 2026.
- County shareUp to 25%
- Cap per project$4M per project
- Applications dueOctober 30, 2026
- TelemetryTelemetry required on funded pump station and control structure projects.
Source: resilientbroward.com, Resilient Broward Grant Program.
Exports for County systems
GeoJSON for ArcGIS and CSV for Power BI / Snowflake / Databricks. Every feature and row carries its data provenance.