Over threshold now
0
Due in 12 h
7
Storm + tide exposure
23
Units available
9/12
Open tickets
—
Critical open
—
Auto-dispatched
—
Stops skipped today
75%
9 ready
7 owned · 5 subcontracted · 1 subs working
9 available · 1 en route · 1 on job · 1 offline
1 structure due
Of 16 manholes, wet wells and siphons in the next 12 h
- WW-SH1 · Shorecrest66% → 76%
6 interceptors due
5 repeat-violation sites on watch
- GT-WYN · Wynwood72% → 89%
- GI-DAD · Kendall66% → 89%
- GI-C8A · Little Havana68% → 87%
Unavailable
Ticket store unreachable
23 sites at risk
4 in rain on a 3.4 ft tide · 5 road segments flood · 16 more than today
Pre-position units and draw down wet wells before the peak. Use the sliders on the routing page to test other storms.
52% from chronic sites
12 of 28 sites (43%) carry 52% of storm-day demand
Level-driven routing skips 75% of scheduled stops today. Budget for the chronic few first, not a blanket cycle. Owned crews average $155/h.
- 1WW-SH1 · ShorecrestChronicKing-tide flooding, saline I&I120%2.0 h
- 2WW-MB1 · Miami BeachChronicTidal backflow, chronic surcharge120%2.5 h
- 3MH-B12 · BrickellChronicTidal backflow through bay outfall120%3.3 h
- 4WW-OT2 · OvertownChronicPump ragging, repeat high-level alarms113%3.2 h
- 5MH-W31 · WynwoodChronicRagging from mixed-use laterals108%3.0 h
- 6GT-WYN · WynwoodChronicUndersized traps, frequent overflow93%1.7 h